Design, Facilities & Safety Services


ARCHIVE - Project available for bids

Back to Projects Available for Bid

South Hall, Bldg. 528 and Music Bldg. 531 Boiler Upgrade
posted 2018-08-24
Events Center Boiler Replacement, Bldg. 505 (REBID)
posted 2018-08-24
North Campus Open Space Cart Barn
posted 2018-08-24
Recreation Center Fields 1, 2 and 3 LED Relamping
posted 2018-08-24
Job Order Contract - Campus Boiler Replacement Project
posted 2018-08-24
Broida Hall Room 1310 Lab Renovation, Bldg. 572
posted 2018-08-24
Elevator Modernization & Jack Replacement, Music, MRL & Hatlen Theater
posted 2018-05-11
One-on-One Plan Review for Broida Hall Room 1310 Lab Reno
posted 2018-05-11
Events Center Boiler Replacement, Bldg. 505 (REBID)
posted 2018-05-10
Henley Hall Tree Removal
posted 2018-02-27
Henley Hall East Driveway Improvements
posted 2018-02-27
Santa Catalina Boiler Replacement, Bldg. 860
posted 2017-10-20
Corwin Pavilion AC Unit Replacement, Bldg. 558
posted 2017-10-04
Ellison Hall Rooms 1620 and 1629 Laboratory Renovation, Bldg. 563
posted 2017-10-04
El Centro Renovation, General Contracting Work, Bldg. 406
posted 2017-08-28
Bio II Seawater Lab Room 1139, Bldg. 571
posted 2017-08-21
Broida Hall Room 1251 Laboratory Renovation, Bldg. 572
posted 2017-08-21
Mosher Alumni House Accelerator Project Renovation, Bldg. 517
posted 2017-08-09
El Centro Renovation, Furnish and Install Doors and Windows, Bldg. 406
posted 2017-08-02
El Centro Renovation, Foundation, Site Work and Framing Repair, Bldg. 406
posted 2017-08-02
Job Order Contract - Hazardous Material Removal and Demolition (2017)
posted 2017-08-01
Job Order Contract - Hazardous Material Removal and Demolition
posted 2017-08-01
Chemistry Lab Renovation, Room 3222, Bldg. 557
posted 2017-07-28
Storke Soccer Practice Field (REBID)
posted 2017-07-27
Elevator Modernization, #3, #2 & #1, Phelps Hall, Bldg. 560
posted 2017-07-21
Parking Lot No. 38 Slurry and Striping
posted 2017-07-18
El Centro Renovation, Furnish and Install Doors and Windows, Bldg. 406 (REBID)
posted 2017-06-29
Storke Soccer Practice Field
posted 2017-06-23
North Campus Open Space Multimodal Trail Project (REBID)
posted 2017-06-19
North Campus Open Space Multimodal Trail Project
posted 2017-06-19
North Campus Open Space Bridges (UFCI)
posted 2017-06-07
Parking Lot 23 Rehabilitation
posted 2017-05-19
North Campus Open Space Multimodal Trail Project
posted 2017-04-19
New Psychology Grad. Student Modular, Bldg. 383 and Remodel of Bldg. 387
posted 2017-04-19
South Hall Fire Alarm Replacement, Bldg. 528
posted 2017-03-28
Lab Renovation Room 1118, Cloud Lab, Bldg. 575
posted 2017-03-20
Fly Neuroscience Lab, Room 2159, Bio II, Bldg. 571
posted 2017-03-07
North Campus Open Space Restoration
posted 2017-02-01
Santa Ynez 400s Refurbishment - Rebid
posted 2017-02-01
North Campus Open Space Tree Removal and Environmental Protection
posted 2016-11-22
Coal Oil Point Reserve Renovation
posted 2016-11-17
Infrastructure Renewal Project Phase 1C
posted 2016-10-31
Pauley Track Renovation (Design Build)
posted 2016-09-14
Physiology Lab Renovation, Room 5133, Bldg. 571
posted 2016-09-08
West Courtyard Drainage, Engineering Science Bldg. 225
posted 2016-09-07
Psychology Rooms 3509 and 3513 Renovation, Bldg. 551
posted 2016-08-30
Santa Ynez Apartments 400s Refurbishment - Cancelled (2)
posted 2016-08-16
Santa Ynez Apartments 400s Refurbishment - Cancelled (1)
posted 2016-08-16
Sedgwick Reserve Ranch House Renovation
posted 2016-07-21
Chemistry Lab Renovation, Room 3201, Bldg. 557
posted 2016-06-23
South Hall Elevator Jack Replacement, Elevators 1, 2, 3 & 4, Bldg. 528
posted 2016-05-12
Laboratory Renovation Room 2232, Engineering II, Bldg. 503
posted 2016-05-03
Cabrillo Business Park Landscape and Buffer Improvements
posted 2016-04-08
Roofing Repairs, Buildings 7000 and 7025
posted 2016-04-05
Events Center Floor Replacement (Design Build)
posted 2016-03-04
El Colegio and Storke Road Improvements
posted 2016-02-04
Job Order Contract - Hazardous Material Removal and Demolition
posted 2015-12-23
Broida Hall Rooms 1324 and 1332 Lab Renovations, Bldg. 572
posted 2015-09-16
Repairs to West Campus, Bldgs. 7045 and 7060
posted 2015-09-16
Repairs to West Campus, Bldg. 7040
posted 2015-09-04
Repairs to West Campus, Bldg. 7905
posted 2015-08-26
Repairs to West Campus, Bldg. 7085
posted 2015-08-26
Infrastructure Renewal Project Phase 1B
posted 2015-08-11
Broida Hall Fire Alarm Replacement, Bldg. 572
posted 2015-06-29
Psychology Room 1523 Remodel, Bldg. 551
posted 2015-06-09
Job Order Contract - Hazardous Material Removal and Demolition
posted 2015-05-15
Cheadle Hall Elevator Renewal, Bldg. 552
posted 2015-04-15
Santa Ynez Apartments 400s Refurbishment - Cancelled (1)
posted 2015-04-10
Materials Research Laboratory Infill, MRL, Bldg. 615
posted 2015-03-26
Storke Apartments Exterior Renovation Phase 1
posted 2014-11-13
Storke Apartments Exterior Renovation - Phase 1
posted 2014-09-25
West Campus Apartments Exterior Renovations - Phase 1
posted 2014-09-04
Cheadle Hall Wireless Pneumatic Thermostats, Bldg. 552
posted 2014-09-04
UCEN Tech Store, Bldg. 558
posted 2014-08-20
Robertson Gymnasium Interior Renovation, Bldg. 533
posted 2014-08-15
North Campus Faculty Housing Ongoing Infrastructure
posted 2014-08-13
Orfalea Childcare Center Play Yards, Bldg. 355
posted 2014-07-23
Phelps Hall Technology Managment Program Classroom, Bldg. 560
posted 2014-06-24
UCEN Tech Store, Bldg. 558
posted 2014-06-09
Cabrillo Business Park, Lot 10 Storm Drain
posted 2014-05-16
DeAnza HVAC Replacement, Bldg. 875
posted 2014-05-05
Biology II 4th Floor Renovation and HVAC Modernization
posted 2014-04-25
UCSB 12KV Backbone Project
posted 2014-04-08
Santa Cruz Residence Hall Fire Safety and Renewal, Bldg. 548
posted 2014-03-27
Walk-In Refrigerator, Room 1247, UCen , Bldg. 558
posted 2014-03-20
BioEngineering Building
posted 2014-03-05
Sedgwick Reserve Water Main Extension
posted 2014-03-03
SNARL Classroom/Lecture Hall
posted 2014-02-28
Engineering II 3229 Lab Remodel, Bldg. 503
posted 2014-02-20
Davidson Library SEP Project, Bldg. 525
posted 2014-02-04
Police Office Courtyard Redesign, Bldg. 574
posted 2014-01-27
Henley Hall - Institute for Energy Efficiency
posted 2014-01-23
Davidson Library Addition and Renewal Compact Shelving Installation
posted 2014-01-23
Events Center Fire Alarm Replacement, Bldg. 505
posted 2014-01-17
Fire Alarm Mass Notification System, Campbell Hall, Bldg. 538
posted 2014-01-09
Marine Biotechnology Lab Remodel, Bldg. 555
posted 2013-11-13
Sedgwick Reserve Maintenance Shed Renovation
posted 2013-10-10
Sedgwick Reserve Electrical Utility Relocation
posted 2013-10-10
Procedure Room Renovations, 3rd & 4th Floor, Bldg. 571
posted 2013-09-12
Biological Sciences Finish Upgrade, Bldg. 571
posted 2013-08-20
Faculty Club Renovation and Guest House Addition
posted 2013-08-08
22 Parking Structure Photovoltaic Project, Bldg. 254
posted 2013-08-02
Hazardous Material Removal and Demolition (Job Order Contract)
posted 2013-07-31
Campus Paving (Job Order Contract)
posted 2013-07-12
Kohn Hall HVAC Equipment Replacement, Bldg 567
posted 2013-06-24
Chilled Loop Extension to Cheadle
posted 2013-05-10
EHS Waste Processing Ventilation, Bldg. 565
posted 2013-04-30
El Colegio Road Improvement Project - Phase 3
posted 2013-04-15
Santa Ynez Apartments 100s Refurbishment
posted 2013-04-08
Library Surge - Old Gym, Interior Office Construction & Interior Door Installation, Bldg. 479
posted 2013-04-08
Library Surge - Old Gym, Exterior Entrance Door & Card Reader, Bldg. 479
posted 2013-04-08
Library Surge - Old Gym, Painting, Bldg. 479
posted 2013-04-08
Library Surge - Old Gym, Electrical Modifications & Additions, Bldg. 479
posted 2013-04-08
Library Surge - Old Gym, Carpeting, Bldg. 479
posted 2013-04-08
SNARL Road Reconstruction
posted 2013-04-03
San Joaquin Apartments and Precinct Improvements
posted 2013-03-27
Events Center S.E. Air Handler Replacement, Bldg. 505
posted 2013-03-27
Anacapa Residence Hall Fire Safety and Renewal, Bldg. 527
posted 2013-03-20
Student Housing Data Cabling Storke Apartments, Bldg. 589
posted 2013-03-05
Chemistry Lab Renovation Rooms 2102, 2104, 2106 and 2108, Bldg. 557
posted 2013-02-26
Sierra Madre Apartments [CM at Risk/Best Value Selection]
posted 2013-02-13
2520 PSBN Graduate Student Suite Remodel, Bldg. 657
posted 2013-01-31
Parking Structures 10 & 22 Lighting Upgrade, Bldgs. 252 and 254
posted 2013-01-15
San Rafael E-Key System Expansion, Bldg. 586 & 587
posted 2012-10-30
Exterior Exhaust Shaft, Engineering Sciences Building 225
posted 2012-10-24
De La Guerra Dining Commons Canopy, Bldg. 549
posted 2012-09-19
Davidson Library Addition and Renewal, Bldg. 525
posted 2012-08-13
HSSB Exterior Painting, EIFS Repair and Caulking Re-bid, Bldg. 515
posted 2012-07-25
Arts Building Renovation Communications Inside Wiring Plan - Phase II
posted 2012-06-29
22 Parking Structure Photovoltaic, Bldg. 254
posted 2012-06-15
New Emergency Generator, San Rafael Hall, Bldg. 586
posted 2012-05-21
Engineering Research Center Restoration Project
posted 2012-05-16
Buchanan Hall Rm. 1910 Lighting Renewal Project
posted 2012-05-16
Events Center Locker Rooms Remodel, Bldg. 505
posted 2012-05-15
El Dorado Apartments Refurbishment, Bldg. 945
posted 2012-05-11
Wide Area Emergency Communication System - Main Campus
posted 2012-05-10
HSSB Exterior Painting, EIFS Repair and Caulking, Bldg. 515
posted 2012-05-10
Harold Frank Hall Corridor Flooring Replacement, Bldg. 556
posted 2012-05-08
South Hall Lighting Upgrade, Bldg. 528
posted 2012-05-03
Santa Ynez Apartments 200s Refurbishment
posted 2012-05-02
Harold Frank Hall Corridor LightingReplacement, Bldg. 556
posted 2012-04-23
Ortega and Santa Catalina Dining Commons Boilers Replacement, Bldgs. 542 & 860
posted 2012-04-18
Broida 3400 Laboratory Modifications Bldg. 572
posted 2012-04-18
Santa Rosa Residence Hall Fire Safety and Renewal
posted 2012-04-03
Campus Hot Water Loop Project Phase I
posted 2012-03-19
Robertson Field Renovation
posted 2012-02-06
Kerr Hall Lighting Uprgrade, Bldg. 591
posted 2012-02-03
Greenhouse Replacement Project
posted 2012-01-27
Job Order Contract - Energy Management & Controls
posted 2012-01-11
San Miguel & San Nicolas Landscape Improvements
posted 2011-12-20
Kohn Hall Canopy Replacement, Bldg. 567
posted 2011-11-10
Fire Alarm System Replacement, Biology II, Bldg. 571
posted 2011-11-10
Admissions Office Suite #1234 Remodel
posted 2011-10-24
North Hall Lighting Upgrade
posted 2011-09-23
Museum Renovation, Bldg 534
posted 2011-09-21
Arts Woodshop Temporary Relocation
posted 2011-09-20
Exterior Painting, Events Center Bldg. 505
posted 2011-09-13
Campus Point Stair Access Way
posted 2011-08-22
Stairwell Lighting Upgrades
posted 2011-08-22
Art Museum Security & Access Control, Bldg. 534
posted 2011-08-18
North Campus Faculty Housing Phase II
posted 2011-08-15
HSSB Dance, Drama & High Tower PVC Roof Replacement
posted 2011-08-02
Robertson Gymnasium Re-Roofing, Bldg. 533
posted 2011-07-28
Santa Ynez Landscaping
posted 2011-07-18
Events Center Lighting, Bldg 505
posted 2011-05-25
El Dorado Apartments Re-Roof Project
posted 2011-05-24
UCEN Bookstore Roof Replacement
posted 2011-05-12
Santa Ynez Apartments 300s Refurbishment
posted 2011-05-05
Swimming Pool Renovation - El Dorado Apartments
posted 2011-04-06
New Chiller Systsem Biology II, Bldg. 571
posted 2011-03-24
Broida Hall - Exhaust Fan Replacement Bldg. 572
posted 2011-03-17
Boiler Room Equipment Replacement Carrillo Dining Commons Bldg. 562 & Santa Cruz Residence Hall Bldg. 548
posted 2011-03-17
Ortega Dining Commons Seismic Corrections
posted 2011-03-08
De La Guerra Dining Commons Hood Controls
posted 2011-03-07
Davidson Library IT Consolidation - Room 1523 Bldg. 525
posted 2011-01-20
Room 1508 Renovation De La Guerra Bldg. 549
posted 2011-01-13
Bren Hall Lab Ventilation Upgrade Re-bid
posted 2011-01-11
Room 1111 Space Division Engineering Science Building 225
posted 2010-12-07
Room 1410 Visitor Center Improvements Bren Hall Bldg. 521
posted 2010-12-06
West Campus Bluff Path Re-bid
posted 2010-11-09
Broida Hall #572, Optics Laboratory Modifications Room 1219
posted 2010-10-14
Biology II Boiler Replacement Project, Bldg. 571
posted 2010-09-08
HSSB Tower & Arcade PVC Roof Replacement
posted 2010-08-16
Harder Stadium Concessions
posted 2010-08-13
Santa Catalina Residence Hall Pool Renovation Project
posted 2010-08-11
Bren Hall Lab Ventilation, Bren Hall - Building 521
posted 2010-08-11
Harder Stadium Curtice Gate
posted 2010-07-28
Harder Stadium Scoreboard Re-bid
posted 2010-07-13
Job Order Contract-Campus Paving
posted 2010-06-24
Job Order Contract - Hazardous Material Removal & Demolition in Support of Pblic Bid Projects
posted 2010-06-21
Harder Stadium Scoreboard
posted 2010-06-18
Arts Building Seismic Correction and Renewal
posted 2010-06-14
UCSB Manzanita Village E-Key Project, Building Numbers 877-893
posted 2010-06-11
Lab Remodel Room 1171 and H2 Generator
posted 2010-06-07
Harder Stadium Press Box Renoavtion, Bldg 580
posted 2010-06-04
SNARL Lab Modernization Building 951
posted 2010-05-29
Harder Stadium Turf & Irrigation
posted 2010-04-28
West Campus Faculty Housing Leak Remediation Units 917 & 918
posted 2010-04-20
Chilled Water Main (Events Center to Ocean Road)
posted 2010-04-16
Infrastructure Renewal Phase 1A
posted 2010-04-13
North Hall Data Center
posted 2010-04-07
Hatlen Theater - Lighting, Sound, & Communications/Data Upgrade
posted 2010-04-02
Woodhouse Laboratory Bldg 546, Room Numbers 1028 and 1028A Renovations/HVAC
posted 2010-03-22
Woodhouse Laboratory Bldg 546, Room Numbers 2002 and 2008A Lab Conversions
posted 2010-03-22
Santa Rosa Residence Hall - Landscaping, Building 527
posted 2010-03-04
Microscopy & Cell Culture Renovation, Room 2201, LIfe Science, Bldg 235
posted 2010-02-25
Lab Conversions, Rooms #1612, 1622, 1612A, 1511, 1614, 1645, Physical Sciences Bldg, Bldg 657
posted 2010-02-25
Cage Washer, Biological Sciences II, Bldg 571
posted 2010-02-03
Stem Cell II Laboratory, Biological Sciences II, Bldg 571
posted 2010-02-03
Elings Hall, Bldg 266 - 2nd Floor East Lobby Conversion, Rm 2623 & 3rd Floor East Lobby Conversion, Rm 3623
posted 2010-01-29
Manzanita VillageExterior Painting Project - Be-Bid
posted 2010-01-25
Tipton Meeting House/Completion Phase
posted 2010-01-12
N.W. Air Handler Replacement, Events Cener Bldg. 505
posted 2010-01-04
Ocean Science Education Building - Phase I
posted 2009-10-22
Phelps Hall North Wing Institutional Advancement Remodel
posted 2009-10-21
North Campus Faculty Housing - Phase I
posted 2009-10-14
Mesa Parking Lighting Upgrade
posted 2009-09-29
Air Handler Upgrade, Bio Science II, Bldg 571
posted 2009-09-21
Sedgwick Reserve Barn Restoration - ReBid
posted 2009-09-08
Manzanita Village Exterior Painting Project
posted 2009-08-28
Phelps Creek Stormdrain Outfalls
posted 2009-08-06
2009 Lighting Maintenance and Retrofit
posted 2009-07-29
Glass Wash Relocation, Biological Science, Bldg II, Bldg 571
posted 2009-06-18
Sedgwick Reserve Barn Restoration
posted 2009-06-16
Santa Ynez Floor Covering Replacement Project, Santa Ynez Apartments, Bldg 805-807, 809-811
posted 2009-05-29
Engineering II-Bldg. 503, Laboratory Remodel, Rooms 1119B and 119E
posted 2009-05-06
Job Order Contract - Seal Coat & Striping
posted 2009-04-29
Job Order Contract - Paving
posted 2009-04-29
Public Safety Ventilation
posted 2009-04-28
Fiesta Room Air Handler Retrofit
posted 2009-04-22
Kerr Hall Room 1110 - Building 591
posted 2009-03-26
Associated Students Bike Shop Replacement
posted 2009-03-23
NWC cottages Remodel
posted 2009-03-17
SAn Clemente Student Housing - Bid Release 7 - ReBid (Awnings)
posted 2009-03-17
Harold Frank Hall Renovation - Rooms 4110/4118
posted 2009-03-12
Research Greenhouse
posted 2009-03-05
Biological Sciences II Cagewash Facilities Improvements
posted 2008-12-23
Place, Splice & Terminate Underground Copper, Fiber & Coax Cables
posted 2008-12-03
ESSB Communications Inside Wiring, Bldgs. 275, 276, & 277
posted 2008-12-02
UCSB San Clemente Student Housing - Bid Release 6
posted 2008-12-01
Job Order Contract - Asbestos Abatement, Pb Related Construction & Clean Demolition
posted 2008-11-06
Santa Catalina Towers Restroom & Deck Renovations
posted 2008-10-30
Cosmogenic Nuclide Lab Rooms 1111 B & C Renovation
posted 2008-10-03
Biological Sciences Building Renovation, Bio Scie Unit 2 - Rebid
posted 2008-09-23
Valentine Lab Renovation, CNSI Bldg. 266, Rm. 2404 - Rebid
posted 2008-09-16
Bio 2 and Phelps Hall Fan Replacement
posted 2008-09-08
Anacapa Residence Hall Re-Roofing, Bldg 547
posted 2008-08-21
Rec-Cen Aquatics Complex Renewal
posted 2008-08-20
Recreation Center Locker Room Renewal Bldg. 516
posted 2008-08-18
San Miguel Reclaimed Irrigation Water Continuation Project
posted 2008-08-11
Events Center Air Handler Changeout
posted 2008-07-28
UCSB 2008 Lighting Maintenance & Retrofit
posted 2008-07-25
Valentine Lab Renovation, CNSI Bldg. 266, Room 2404
posted 2008-07-07
El Colegio Road Improvement
posted 2008-06-23
Laboratory Renovation 3166, Harold Frank Hall - Bldg. 556
posted 2008-06-13
Santa Ynex Apartments Floor Covering Replacement, Bldg. 828-830
posted 2008-06-11
Art Surge - Building 434, Womens Center
posted 2008-06-09
Art Surge - Building 479, Old Gym
posted 2008-06-09
Job Order Contract - Campus Paving Projects
posted 2008-06-03
Events Center Sound System Replacement Re-Bid
posted 2008-06-02
SAASB Chilled Waterline Extension Project
posted 2008-05-22
Kerr Hall Re-Roofing, Bldg 591
posted 2008-05-15
UCSB West Campus Bluff Path
posted 2008-05-12
Information Kiosk at University Plaza
posted 2008-05-09
Engineering II Life Safety Improvements Fire Sprinkler and Fire Alarm System Upgrades
posted 2008-04-29
Events Center Sound System Replacement
posted 2008-04-16
Engineering II Life Safety Improvements and Addition
posted 2008-04-11
Stemcell Laboratory Renovation
posted 2008-04-03
Psychology Rooms 2201/2207 Remodel
posted 2008-03-31
UPS Upgrade North Hall - REBID
posted 2008-03-21
Santa Cruz Residence Hall Re-Roofing Project, Bldg. 548
posted 2008-02-15
Engineering I Intra-Building Wiring Project
posted 2008-01-10
UPS Upgrade North Hall - 535
posted 2008-01-07
MOCVD & TCR Lab E-II Room 1141
posted 2008-01-02
Low Pressure Drop Filter Installation
posted 2007-12-12
Recreation Center Expansion Photovoltaic Panel System
posted 2007-10-31
Parking Lot Repairs 2007 - Rebid
posted 2007-10-16
Palmstrom Lab Renovation, Building 503, Room 1315
posted 2007-10-04
Recreation Center Expansion Photovoltaic Panel System Installation 2nd Rebid
posted 2007-09-10
Parking Lot Repairs 2007
posted 2007-09-05
Harold Frank Hall HVAC Upgrade Floors 1-5
posted 2007-09-05
Recreation Center Expansion Photovoltaic Panel Systems-Rebid
posted 2007-07-31
Elevator Modernization, Francisco Torres, San Miguel, San Rafael
posted 2007-07-23
WUDL Lab Fumehood Installation, CNSI, Rooms 2422 & 2428
posted 2007-07-23
Phelps Creek Bridge & Bank Layback
posted 2007-07-06
Devereux Culvert Replacement
posted 2007-06-25
Westgate Re-Roof & Clerestory Repair
posted 2007-05-25
Recreation Center Expansion - Photovoltaic Panel System
posted 2007-05-22
Bldg 300 - Office/Classroom Renovation
posted 2007-05-10
Francisco Torres Tower, Deck Waterproofing and Repairs
posted 2007-05-08
East Gate Installation
posted 2007-05-07
Engineering II Pavilion Renovation
posted 2007-04-30
Music Intra Building Wiring III
posted 2007-03-28
Leak Remediation - Glass Block Replacement
posted 2007-03-19
MRL Lab Remodel, Room 1056
posted 2007-03-07
Burnham Lab Remodel, Room 1056
posted 2007-02-16
Housing & Residential Services: Ortega Office Remodel
posted 2007-01-26
Psychology Basement MRI Machine Rooms
posted 2007-01-26
UCEN Hub Remodel: Ceramic Tile & Cultured Stone
posted 2007-01-24
Re-Bid Manzanita Village Multi-Purpose Center
posted 2007-01-24
Electrical Infrastructure Renewal, Phase 2B
posted 2007-01-16
Academic Building Renewal
posted 2007-01-12
CNSI 266 Optic Characterization, Room 1404
posted 2006-12-19
RECVEB Lab Buildout - Psychology Building Addition Basement
posted 2006-11-21
Parking Lot Repair 2006-2007
posted 2006-11-16
Optical Lab & Computer Lab - Rooms 4150, 4150A, 4162A, 4162B, & 4162C
posted 2006-10-27
Manzanita Village Multi-Purpose Center
posted 2006-10-23
San Nicholas Fire Safety & Repairs
posted 2006-10-17
Sedgwick Reserve Wastewater & Disposal
posted 2006-10-16
Reclaimed Water - UCSB Housing - Phase 2
posted 2006-10-09
Westerly Main Campus Chilled Water
posted 2006-10-02
UCEN Hub Remodel - Phase II
posted 2006-09-28
Leak Remediation Program-Glass Block Replacement
posted 2006-09-26
Education & Social Sciences Building, Re-Bid 2
posted 2006-09-20
E-Beam Lith Environmental Chamber _ ReBid
posted 2006-09-19
657 PSB Hawker Lab Renovation
posted 2006-09-05
ONI West Fiber Optic Conduit Installation
posted 2006-08-29
UCEN Hub Remodel - Phase I
posted 2006-07-31
E-Beam Lith Environmental Chamber
posted 2006-07-19
Petzoid Lab Remodel
posted 2006-07-18
Music Intra Building Wiring - Phase II
posted 2006-06-01
Campbell Hall Dressing Room Upgrades
posted 2006-05-08
UCEN HUB INTERIOR REMODEL
posted 2006-04-28
San Miguel Fire Safety & Repairs
posted 2006-04-25
UCEN HUB INTERIOR REMODEL
posted 2006-04-21
Ortega Dining Commons Re-Roofing
posted 2006-04-13
Biological Sciences Buildings Renovation - Noble Hall
posted 2006-02-21
Biological Sciences Bldg. Renovations - Bio Sciences Unit 2 Bldg.
posted 2006-02-13
Saleh Lab Remodel
posted 2006-02-07
East Entrance Road Improvements
posted 2006-01-23
Bren 4th Floor HVAC
posted 2006-01-04
Education and Social Sciences Building - REBID
posted 2005-12-21
MOCVD Expansion
posted 2005-11-14
Carrillo Dining Commons Kitchen Addition
posted 2005-11-14
KIPPIN & ETTENBERG LAB REMODEL
posted 2005-09-21
SAASB REMODEL-SUMMER SESSIONS OFFICES
posted 2005-08-26
Recreation Center Spa Rebid
posted 2005-08-10
WATER BOOSTER PLANT SUPPLY LINE RELOCATION
posted 2005-08-08
ELLISON HALL ELEVATOR JACK REPLACEMENT
posted 2005-07-29
BIOLOGICAL SCIENCES BUILDINGS RENOVATION
posted 2005-07-27
Nguyen Lab Remodel
posted 2005-07-06
HAN LAB RENOVATION
posted 2005-07-06
Harder Stadium Site Improvements for Flammable Storage Container
posted 2005-06-21
Broida Expressway Bicycle Path Rebid
posted 2005-06-21
Arbor Remodel Convenience Store Casework & Fixtures
posted 2005-06-20
Mosher Alumni House
posted 2005-06-10
RECLAIMED WATER - UCSB HOUSING
posted 2005-05-25
Recreation Center Spa
posted 2005-03-28
Education and Social Sciences Building
posted 2005-03-11
Education and Social Sciences Building
posted 2005-03-11
San Clemente Student Housing
posted 2004-12-16
San Clemente Parking Structure
posted 2004-12-16